This project involved the construction of heavy-duty concrete pavements for McColl’s Transport at its Colac depot, delivering durable infrastructure designed to accommodate frequent heavy vehicle movements and operational demands within an active transport facility.
Kelly Civil Construction undertook the civil and concrete works associated with the project, including site preparation, earthworks, drainage installation, and pavement construction. Works were carried out both within an existing depot shed and at the property entrance, where a new heavy-duty turning driveway was constructed to improve vehicle access.
A key component of the project was the installation of a heavy-duty grated U-drain within the shed to provide effective drainage and manage surface water generated by depot operations. The drainage system was carefully set out and installed to ensure compatibility with the finished pavement levels and ongoing site requirements.
Concrete works included formwork installation and concrete placement to construct robust industrial pavements capable of withstanding heavy vehicle loading and repetitive traffic movements. All works were completed in accordance with project specifications, quality assurance procedures, and stringent safety requirements.
Delivered within an operational transport depot, the project required careful planning, coordination, and communication with the client. The completed works provided McColl’s Transport with upgraded pavement and drainage infrastructure, enhancing operational efficiency, safety, and long-term asset performance.